Topic: Tidal Petroleum

Crescent Point Completions

Well Highlights from Marcellus, Eagle Ford, & Williston

EQT completes 3 mile lateral well in Marcellus (2019-01-03) EQT reported two completions on a multiple well pad in Washington county, Pennsylvania. Haywood Mon110H24 and Haywood Mon110H25 were completed on January 3 and tested January 7. The H24 produced 15,565 MMcf of gas on its 38 stage lateral with a vertical depth of 7,332 ft. The H25 was drilled to 7,304 ft with a 129 stage 18,450 ft lateral length. Both wells use frac material provided by FTSI International, perforations by...

Read More

Delaware, Eagle Ford, Bakken, and SCOOP New Well Highlights

Tidal Petroleum Uses 7.5 Million Pounds of Frac Sand and 2459 bbls HCL Acid (2018-08-13) An Eagle Ford well was completed by Tidal Petroleum in Karnes, Texas. The Moy South 1H produced 24-hour IP rates of 2644 bbl of oil, 1,584 MMcf of gas, and 216 bbl of water along the 3,546 lateral. Enterprise Products is the gatherer for crude, condensate, and gas for the pad. Tidal Petroleum reported flowing tubing pressures of 4900 PSI and a 22/64 choke size. Discovery Natural...

Read More